中国建筑装饰协会施工委员会官方网站 登陆   注册  设为首页
搜索
工程装饰奖

云南洲际酒店

酒店  | 2015-3-5 12:34:38
  1. +.jpg

  2. IMAG0379.jpg

  3. IMAG0385.jpg

  4. IMAG0387.jpg

  5. IMAG0391.jpg

  6. IMAG0402.jpg

  7. IMAG0404.jpg

  8. IMAG0407.jpg

  9. IMAG0420.jpg

  10. IMAG0657.jpg

  11. IMAG0662.jpg

  12. IMAG0663.jpg

  13. IMAG0679.jpg

  14. IMAG0680.jpg

  15. IMAG0681.jpg

  16. IMAG0685.jpg

  17. IMAG0688.jpg

  18. IMAG0697.jpg

  19. IMAG0698.jpg

  20. IMAG0699.jpg

  21. IMAG0700.jpg

  22. IMAG0701.jpg

  23. IMAG0702.jpg

  24. IMAG0708.jpg

  25. IMAG0709.jpg

  26. IMAG0710.jpg

  27. IMAG0711.jpg

  28. IMAG0712.jpg

  29. IMAG0714.jpg

  30. IMAG0715.jpg

  31. IMAG0718.jpg

  32. IMAG0719.jpg

  33. IMAG0720.jpg

  34. IMAG0756.jpg

  35. IMAG0757.jpg

  36. IMAG0770.jpg

  37. IMAG0771.jpg

  38. IMAG0772.jpg

  39. microMsg.1369398405488.jpg

  40. microMsg.1369399423267.jpg

工程名称:昆明洲际酒店(云南海埂会议中心商务酒店)装饰工程

Project: Kunming Intercontinental Hotel (Yunnan Haigeng Conference Center Hotel)Decoration Engineering

承建单位: 深圳市嘉信装饰设计工程有限公司

Constructed by: Shenzhen Gasu Decoration Design Engineering Co., LTD.

承建范围: 一、二区区域内部装修工程(包括一、二区域内的客房、S3总统套房、楼梯间、布草间、电梯厅等等室内装饰施工和安装及图纸深化设计。

Coverage: Interior decoration project in the first and second region ( including the interior decoration, installation and drawing deep design , such as living rooms、S3 presidential suites、staircases、linen rooms and elevator lobbies.)

工程简介:

Project Description:

昆明洲际酒店(云南海埂会议中心商务酒店)装饰工程是云南省城市建设投资集团有限公司2009年投资建设,2013年6月建成并投入使用。商务酒店项目总建筑规模:94433m2,总投资约17亿元人民币,属于云南省海埂会议中心项目的配套设施工程。该工程土建主体部分由云南建工集团第二建筑工程有限公司承建,深圳市嘉信装饰设计工程有限公司承建酒店一、二区域内的客房、S3总统套房、楼梯间、布草间、电梯厅等室内装饰施工和安装及图纸深化设计。

Kunming Intercontinental Hotel (Yunnan Haigeng Conference Center Hotel)Decoration Engineering was invested and constructed by Yunnan Urban Construction Investment Group Co., LTD. in 2009. The project was finished and put into use in June 2013. The total area of the building is 94433 m2 and the total investment is about 1.7 billion yuan. This project is a supporting facilities engineering of Yunnan Haigeng Conference Center Project. The main part of civil construction works is contracted by the Second Construction Engineering Co., LTD affiliated by Yunnan Construction Engineering Group. While Shenzhen Gasu Decoration Design Engineering Co., Ltd, contracted the interior decoration, installation and drawing deep design in the first and second region, such as living rooms、S3 presidential suites、staircases、linen rooms and elevator lobbies.

合同造价为:90137707.85元人民币。申报施工范围主要包括:一、二区域内的客房、S3总统套房、楼梯间、布草间、电梯厅等室内装饰施工和安装及图纸深化设计。

工程装饰装修于2012年9月开工,于2013年6月25日竣工,历时297天。

The cost of the contract is 90137707.85 yuan.

The construction covers: the interior decoration, installation and drawing deep design in the first and second region, such as living rooms、S3 presidential suites、staircases、linen rooms and elevator lobbies.

The decoration project started on September 2012 and was finished by June 25, 2013,lasting 297days.

关键字:
本文来源:
相关新闻
看过本文的人还看过
最新动态
专题
2016年创精品工程经验交流会暨走进杭州G20峰会工程观摩会圆满结束
关于召开2015-2016年度中国建筑工程装饰奖颁奖大会的通知

主办:中国建筑装饰协会施工委员会

联系地址:北京市海淀区三里河路21号甘家口大厦710A 邮编:100037

网站联系:010-68703315 京ICP备06032596号